Ara
Toplam kayıt 6, listelenen: 1-6
A Fuzzy ANP Approach To Evaluate Computer Simulation Packages
(Inderscience Enterprises Ltd., 2016)
In this study an intelligent approach is presented to help any simulation practitioner to evaluate simulation software alternatives and determine the best satisfying one based on his/her needs. On the other hand this ...
Analytic Network Process (ANP) for solar power plant location problem
(Institute of Industrial Engineers, 2010)
Solar energy is the most readily available source of energy and one of the most important sources of the renewable energy because it is non-polluting and helps in lessening the greenhouse effect. Main problem of establishing ...
Determining master schedule of surgical operations by integer programming: A case study
(Institute of Industrial Engineers, 2010)
Fixed amounts of available Operating Room (OR) time compatibility of ORs and restrictions related to surgery equipment and surgeon availabilities complicate the process of preparing the master surgical schedule at hospitals. ...
An intelligent approach to CAM software selection
(IEEE, 2012)
In this paper an intelligent approach is presented to help the companies select most suitable CAM software for their current and future needs. For this purpose fuzzy AHP method is used to carry out CAM selection process ...
A MULTIPLE-CRITERIA DECISION MAKING METHOD FOR EVALUATING SOLAR POWER PLANT LOCATION ALTERNATIVES
(EDITURA ASE, 2015)
Solar energy is the most readily available source of energy and one of the most important sources of the renewable energy because it is non-polluting and helps in lessening the greenhouse effect. Main problem of establishing ...
AHP-BASED APPROACH TO EVALUATE SOLAR POWER PLANT LOCATION ALTERNATIVES
(Intl Inst Social & Economic Sci, 2016)
Solar energy is the most readily available source of energy, and one of the most important sources of the renewable energy, because it is non-polluting and helps in lessening the greenhouse effect. Main problem of establishing ...