Markov-Modulated Analysis of a Spare Parts System With Random Lead Times and Disruption Risks

No Thumbnail Available

Date

2018

Authors

Hekimoğlu, Mustafa
van der Laan, Ervin
Dekker, Rommert

Journal Title

Journal ISSN

Volume Title

Publisher

Elsevier Science Bv

Open Access Color

HYBRID

Green Open Access

No

OpenAIRE Downloads

OpenAIRE Views

Publicly Funded

No
Impulse
Top 10%
Influence
Top 10%
Popularity
Top 10%

Research Projects

Journal Issue

Abstract

Spare parts supply chains are highly dependent on the dynamics of their installed bases. A decreasing number of capital products in use increases the nonstationary supply-side risk especially towards the end-of-life of capital products. This supply-side risk appears to present itself through varying lead times coupled with supply disruptions. To model the nonstationary supply-side risk we consider an exogenous Markov chain that modulates random lead times and disruption probabilities. Assuming that order crossovers do not occur we prove the optimality of a state-dependent base stock policy. Later we conduct an impact study to understand the value of considering stochastic lead times and supply disruption risk in spare parts inventory control. Our results indicate that the coupled effect of random lead times and disruptions can be larger than the summation of individual effects even for moderate lead time variances. Also the effect of nonstationarity on total cost can be as large as the summation of all risk factors combined. In addition to this managerial insight we present a procedure for supply risk mitigation based on an empirical model and our mathematical model. Experiments on a real business case indicate that the procedure is capable of reducing costs while making the inventory system more prepared for disruptions. (C) 2018 Elsevier B.V. All rights reserved.

Description

Keywords

Supply chain management, Supply risk, Stochastic lead times, Optimal inventory control, Spare parts, Supply risk, Spare parts, Optimal inventory control, Stochastic lead times, RSM LIS, Supply chain management, supply chain management, Transportation, logistics and supply chain management, Inventory, storage, reservoirs, optimal inventory control, stochastic lead times, supply risk, spare parts

Turkish CoHE Thesis Center URL

Fields of Science

0209 industrial biotechnology, 0211 other engineering and technologies, 02 engineering and technology

Citation

WoS Q

Q1

Scopus Q

Q1
OpenCitations Logo
OpenCitations Citation Count
11

Source

European Journal of Operational Research

Volume

269

Issue

3

Start Page

909

End Page

922
PlumX Metrics
Citations

Scopus : 16

Captures

Mendeley Readers : 56

Google Scholar Logo
Google Scholar™
OpenAlex Logo
OpenAlex FWCI
3.34397442

Sustainable Development Goals

5

GENDER EQUALITY
GENDER EQUALITY Logo

8

DECENT WORK AND ECONOMIC GROWTH
DECENT WORK AND ECONOMIC GROWTH Logo

9

INDUSTRY, INNOVATION AND INFRASTRUCTURE
INDUSTRY, INNOVATION AND INFRASTRUCTURE Logo

10

REDUCED INEQUALITIES
REDUCED INEQUALITIES Logo