Search
Now showing items 1-9 of 9
Towards Faster Branch Outage Simulations Using Simulated Annealing and Parallel Programming
(IEEE, 2009)
Contingency studies such as branch outage and generator outage are among important studies of energy management centers operations. Branch outage modeling on the other hand is one of the basic steps of post-outage state ...
Parallel Contingency Analysis Using Differential Evolution Based Solution For Branch Outage Problem
(IEEE, 2010)
Contingency analysis is one of the most fundamental work an electricity management center operator has to perform regularly. If both bus voltage magnitudes and reactive power flowing on the branches during any type of ...
Assessment of Harmonic Distortion on Distribution Feeders with Electric Vehicles and Residential PVs
(IEEE, 2017)
Power-electronic interfacing based devices such as photovoltaic (PV) panels and electric vehicles (EVs) cause voltage/current harmonic distortions on the power grid. The harmonic current profiles from EVs and PVs depend ...
Double branch outage modeling and its solution using differential evolution method
(2011)
Power system operators need to check the system security by contingency analysis which requires power flow solutions repeatedly. AC power flow is computationally slow even for a moderately sized system. Thus fast and ...
Post outage bus voltage calculations for double branch outages
(IEEE, 2012)
Secure operation of electrical power systems is vital hence fast and accurate post-outage state calculations are important for contingency analysis. Contingency analysis includes simulations of both the single and double ...
Branch outage solution using particle swarm optimization
(2008)
For post outage MW line flows and voltage magnitude calculations most of the methods use linear methods because of their simplicity. Especially for reactive power flow calculations one can face high errors. In this paper ...
Gravitational search algorithm for post-outage bus voltage magnitude calculations
(2010)
Branch outage problem is one of the key problems in power system security analysis. This paper solves branch outage problem using a bounded approach. Local constrained optimization problem in the bounded approach is solved ...
Harmony search method based parallel contingency analysis
(2010)
Power system security management is one of the key problems in power system analysis. Power system management center operators need to simulate contingencies as fast as possible and take the remedial actions in time. These ...
Post-outage state estimations for outage management
(IFAC Secretariat, 2011)
Real time outage information is required to the utility operators for outage management process. In addition to some basic information regarding the outage post-outage system status will help to improve the response to ...