• English
    • Türkçe
  • Türkçe 
    • English
    • Türkçe
  • Giriş
Öğe Göster 
  •   Açık Akademik Arşiv Ana Sayfası
  • Enstitüler / Institutes
  • Yüksek Lisans Tezleri
  • Öğe Göster
  •   Açık Akademik Arşiv Ana Sayfası
  • Enstitüler / Institutes
  • Yüksek Lisans Tezleri
  • Öğe Göster
JavaScript is disabled for your browser. Some features of this site may not work without it.

Arsa payı karşılığı inşaat sözleşmesinde arsa sahibinin ayıba karşı tekeffülden doğan hakları / The rights of the land owner in the construction agreement in return for land share for warranty against defects

Thumbnail
Göster/Aç
615862.pdf (1.770Mb)
Tarih
2020
Yazar
Erman, Hasan Ünsal
Özet
Çalışmamızın konusu, arsa payı karşılığı inşaat sözleşmelerinde yüklenici tarafından ayıplı eser meydana getirilmesi halinde arsa sahibinin sahip olduğu haklar üzerinedir. Gerçekten de, uygulamada arsa payı karşılığı inşaat sözleşmesine konu yapılarda meydana gelmesi muhtemel ayıplar nedeniyle taraflar arasında çoğu zaman ihtilaflar çıkmaktadır. Borçlar Kanununun 475. maddesinde yüklenici tarafından ayıplı olarak imal edilen esere karşı arsa sahibine, sözleşmeden dönme, eserin ücretsiz olarak onarılmasını talep etme, ayıplı eserin bedelinin indirilmesini talep etme olmak üzere üç adet seçimlik hak tanınmıştır. Ancak, kanun koyucu bu seçimlik hakların kullanılması için; arsa sahibine, eserin muayene edilmesi ve eserde ayıp tespit edilmesi halinde bu ayıbın yükleniciye ihbar edilmesi külfetini yüklemiştir. Ayrıca, arsa sahibinin seçimlik haklarının dışında genel hükümlere göre tazminat talep etme hakkı da bulunmaktadır. Çalışmamızda arsa sahibinin sahip olduğu bu seçimlik hakların ve tazminat taleplerinin şartları, ayıp kavramı da açıklanmak suretiyle kanuni düzenleme, doktrin ve Yargıtay kararları çerçevesinde ele alınmıştır.
 
The subject of our study is on the rights of the land owner in case of defective work by the contractor in the construction agreement in return for land share. Disputes often arise between the parties due to deficiencies likely to occur in the structures subject to the construction agreement in return for land share in practice. The land owner have three rights if the work produced defective by contractor; termination of contract, wage reduction and repair of the defective work by Article 475 of the Code of Obligations ( TBK) In Turkish legal system; the land owner has to obligate the notification to the contractor if the work defective. On the other hand, the land owner doesnt use these three optional rights against to contractor. The land owner also have the right to demand indemnity against the contractor. The conditions of these three optional rights of the land owner and right to demand indemnity against the contractor were discussed with the legal regulation, doctrine and supreme court decisions in our study.
 

Bağlantı

https://hdl.handle.net/20.500.12469/4116

Koleksiyonlar

  • Yüksek Lisans Tezleri [1074]

Paylaş


DSpace software copyright © 2002-2015  DuraSpace
İletişim | Geri Bildirim
Theme by 
@mire NV
 

 

Göz at

Tüm Akademik ArşivBölümler & KoleksiyonlarYayın Tarihine GöreYazara GöreBaşlığa GöreKonuya GöreTüre GöreDile GöreDepartmana GöreYayıncıya GöreKHAS Yazarına GöreErişim Türüne GöreBu KoleksiyonYayın Tarihine GöreYazara GöreBaşlığa GöreKonuya GöreTüre GöreDile GöreDepartmana GöreYayıncıya GöreKHAS Yazarına GöreErişim Türüne Göre

Hesabım

GirişKayıt

İstatistikler

Google Analitik İstatistiklerini Görüntüle

DSpace software copyright © 2002-2015  DuraSpace
İletişim | Geri Bildirim
Theme by 
@mire NV